Plant Overview
Capacity: 3,000 m³/d
Technology: MMF+SWRO+BWRO
Customer: APP Group
Project Name: APP Kendari project
Project summary: Provide uninterrupted high-quality process water for the self-powered power plant
Location: Mprosi village, Bondoala district, Sulawesi island, Kendari city, Indonesia
Project start date: December of 2016
Project end date: January of 2018
Commissioning Date: 2017
Name of partner: Tsingtao Tongfang Thermal Equipment Co., Ltd
Project Highlights
The installed capacity of the power plant is 2x50MW, and the customized desalination system provides stable fresh water supply for its boilers
High reliability, no shutdown operation of the system and good quality and stable water production
Reasonable integration of the equipment, elegant appearance
High efficiency from axial piston type high pressure pump technology together with isobaric exchanger technology
Strong corrosion resistance of equipment material, leading in every detail
No temporary change on construction site, no delay in construction period
Closely cooperate with the project owner, after the commissioning the operators got systematic training and they can operate the system by themselves competently